microsoft project training - Resource Levelling

resolvedResolved · Low Priority · Version Standard

Jamie has attended:
Project Intro Intermediate course
Project Advanced course

Resource Levelling

Could you please explain

RE: Resource Levelling

Jamie

Resource levelling is an option with MS project, to ensure that people are not over resourced, or in RED, in the Resource Usage or Resource sheet. It does this by moving the resource onto a day they are not being used.

regards

info@stl-training.co.uk


 

MS Project tip:

Autofit column width – Project (all versions)

At the top of the columns where each column name is located (Task Name, Duration, etc.), hover over the vertical column line which you want to move.

A short bold vertical line will appear, with horizontal arrows pointing left and right.

Left click and hold this icon and it will permit you to grab the column line, allowing you to move it left or right to your desired location.

View all MS Project hints and tips


Server loaded in 0.08 secs.