project

Public Schedule Face-to-Face & Online Instructor-Led Training - View dates & book

Forum home » Delegate support and help forum » Microsoft Project Training and help » Project 2003

Project 2003

resolvedResolved · Low Priority · Version 2003

Medhya has attended:
Project Intro Intermediate course

Project 2003

How does the traffic light system work? And how can it be set up? Is i a useful tool?

RE: Project 2003

Hi Medhya

Thank you for your question.

The traffic lights are called Graphical Indicators and are created by using one of the built in custom fields. You can do this by going to Tools > Customize > Fields

Whichever custom field you choose to edit you can click on the Graphical indicators button to create a test, values and resulting indicator to use if the test is true.

I hope this helps. We look at graphical indicators in more detail on our MS Project Advanced course. You can find information online at: https://www.stl-training.co.uk/ms-project-courses-london-2003-advanced.php

I hope this helps - do let us know if you have any further questions.

Kind regards,
Andrew

RE: Project 2003

You will find a couple of articles as well as a video on how to create Graphical Indicaotrs here:
http://www.pmconnection.com/modules.php?name=Web_Links& ;l_op=search&query=graphical%20indicator&orderby=hitsD

Hope this helps!


 

MS Project tip:

Create own ribbon tab - Project 2010

a. In Project click on the File tab
b. Select Options from left hand side
c. Choose the Customize Ribbon section
d. Click the New Tab button (below the list of tabs on the right hand side of the dialog box)
e. Select the New Tab (Custom) and enter a name, by clicking the Rename button (below the list of tabs on the right hand side of the dialog box)
f. Select the New Group (Custom) and enter a name, by clicking the Rename button (below the list of tabs on the right hand side of the dialog box)
g. Add commands to your tab and group by locating them on the list on the right hand side (remembering that you can change the list using the drop down box at the top of the list of commands) and clicking the Add button between the two panes to add them to your tab and group
h. You can rearrange the commands in your group, the groups on any tab or the tabs, using the up and down arrow buttons beside the list of tabs.
i. Click OK to apply your changes

View all MS Project hints and tips


Server loaded in 0.08 secs.