On the resource sheet why are some of the entries now in red?

RE: MS Project

David

Entries in red it means the resource is over worked basically, you have the resource probably doing more work than they have capability to do so on a give date, check out the Resource usage sheeet and the Resource Graph view.

Have you tried Tools- Level resourcing?

I suggest you save your file as a different name prior to doing this as it can have some un anticiapted results.

hope this helps

Best Training Team


 

MS Project tip:

Autofit column width – Project (all versions)

At the top of the columns where each column name is located (Task Name, Duration, etc.), hover over the vertical column line which you want to move.

A short bold vertical line will appear, with horizontal arrows pointing left and right.

Left click and hold this icon and it will permit you to grab the column line, allowing you to move it left or right to your desired location.