Resource pool with sharepoint


How does the link on saving work with resource pool and share point

RE: Resource pool with sharepoint

Hi Suzan

It looks like MS Project 2013 won't allow you to maintain a resource pool when stored on Sharepoint. However I have found two possible work-arounds that you might find interesting. I also suspect a search for third-party plug-ins might also offer you options.

Here are the articles I found after a bit of hunting...

https://social.technet.microsoft.com/Forums/sqlserver/en-US/275b028f-3b7a-42f7-9cb1-126ec138847c/project-2013-projects-subprojects-resource-pool-and-sharepoint-sync-to-task-lists-not?forum=projectprofessional2010general

and

https://social.technet.microsoft.com/Forums/projectserver/en-US/c6d03c14-8b67-4f54-88fc-8428e860a401/resource-pool-with-sharepoint?forum=projectprofessional2010general

I hope you find these helpful. Do let me know if you have any other questions.

Kind regards,
Andrew

Tue 24 Mar 2015: Automatically marked as resolved.


 

MS Project tip:

Create own ribbon tab - Project 2010

a. In Project click on the File tab
b. Select Options from left hand side
c. Choose the Customize Ribbon section
d. Click the New Tab button (below the list of tabs on the right hand side of the dialog box)
e. Select the New Tab (Custom) and enter a name, by clicking the Rename button (below the list of tabs on the right hand side of the dialog box)
f. Select the New Group (Custom) and enter a name, by clicking the Rename button (below the list of tabs on the right hand side of the dialog box)
g. Add commands to your tab and group by locating them on the list on the right hand side (remembering that you can change the list using the drop down box at the top of the list of commands) and clicking the Add button between the two panes to add them to your tab and group
h. You can rearrange the commands in your group, the groups on any tab or the tabs, using the up and down arrow buttons beside the list of tabs.
i. Click OK to apply your changes