Different cost tabs for resource

How do you point plan at a different resource cost tab

RE: Different cost tabs for resource

Hi Carol,

I'm really sorry, as I said that I would show you this during the course and ended up not coming back to it.

Once you have set up a number of different cost tables for a resource within the resource sheet. You then need to select the Resource Usage view. Then select the specific task or group of tasks belonging to a particular resource that you wish to apply a different cost table to. Double click if it's a singluar task, or right click if it's a range of tasks and choose Assignment information. Then select the 'General Tab' and in the bottom right hand corner of this dialogue box you have the ability to select a different cost table.

I hope that answers your query.

Kind regards

Carmen

RE: Different cost tabs for resource

Hi Carmen,

No problem, I only realised at the end when I was going through my notes and found it.

I really enjoyed the course thanks, it was an excellent use of 2 days.

Carol


 

MS Project tip:

Autofit column width – Project (all versions)

At the top of the columns where each column name is located (Task Name, Duration, etc.), hover over the vertical column line which you want to move.

A short bold vertical line will appear, with horizontal arrows pointing left and right.

Left click and hold this icon and it will permit you to grab the column line, allowing you to move it left or right to your desired location.

View all MS Project hints and tips


Server loaded in 0.08 secs.