Is it better to change max units to 200% if you have 2 people with the same job (e.g. project assistant) or to add the resource twice?
Thanks
use 200% it is less confusing
|
MS Project tip:Formatting Bar TextTo display notes or resource initials on the Gantt chart bars, choose Format, Bar Styles and the Text tab. Select the position you want to show the text i.e. Top or Inside etc, then choose the field name you are looking for from the drop down arrow. Type the first letter of the name to get quickly to the top of the letter range. Click OK. |