microsoft+project+training - Resource pool

resolvedResolved · Low Priority · Version Standard

Raymond has attended:
Project Intro Intermediate course

Resource pool

How do I set up a resource pool

RE: resource pool

Enter only names in a project and use share resources from...[name of your resource pool file], ensure the pool file is open at the same time as you wish to share.

info@stl-training.co.uk


 

MS Project tip:

Autofit column width – Project (all versions)

At the top of the columns where each column name is located (Task Name, Duration, etc.), hover over the vertical column line which you want to move.

A short bold vertical line will appear, with horizontal arrows pointing left and right.

Left click and hold this icon and it will permit you to grab the column line, allowing you to move it left or right to your desired location.