Multiproject tasking

resolvedResolved · Low Priority · Version Standard

Bothwell has attended:
Project Intro Intermediate course

Multiproject tasking

How much pratice should one get before attending the MS Project advanced course. I have attended the Intro/Intermediate

RE: Multiproject tasking

Hi Bothwell

Probably the best guide is the syllabus for the course. Take a look at the Project Advanced course syllabus. If the contents seems relevant and you are happy with the topics already covered then you should be in a good position to benefit from the training.


 

MS Project tip:

Autofit column width – Project (all versions)

At the top of the columns where each column name is located (Task Name, Duration, etc.), hover over the vertical column line which you want to move.

A short bold vertical line will appear, with horizontal arrows pointing left and right.

Left click and hold this icon and it will permit you to grab the column line, allowing you to move it left or right to your desired location.